VANCOUVER, BC — November 23, 2020 — Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPA) (“Bam Bam” or the “Company”) is pleased to report that drilling in core holes MHB-7, MHB-8, and MHB-9 are complete.
The core holes were placed to expand the sulfide copper porphyry mineralization intersected in historic drilling and to extend the known oxide mineralization. Three holes were drilled for a total of 4920 feet (1499.6 meters).

caption

caption